Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Generator Signal Circuit





LIGHTING (EXT): LIGHTING SYSTEM: Generator Signal Circuit
- Generator Signal Circuit

DESCRIPTION

The daytime running light relay receives an engine condition signal via the generator.

WIRING DIAGRAM





INSPECTION PROCEDURE

PROCEDURE

1. CHECK DAYTIME RUNNING LIGHT RELAY ASSEMBLY

(a) Measure the voltage according to the value(s) in the table below.





Standard Voltage:





NG -- INSPECT GENERATOR ASSEMBLY

OK -- PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Exterior Lighting System

2. INSPECT GENERATOR ASSEMBLY

(a) Inspect the generator assembly Testing and Inspectionfor 2ZR-FE, Testing and Inspection for 2AZ-FE).

Result:





C -- REPLACE GENERATOR ASSEMBLY Components

B -- REPLACE GENERATOR ASSEMBLY Components

A -- REPAIR OR REPLACE HARNESS OR CONNECTOR (GENERATOR ASSEMBLY - DAYTIME RUNNING LIGHT RELAY)