Installation
U760E AUTOMATIC TRANSMISSION / TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Move the shift lever to N.
(b) Align the protrusions of the park/neutral position switch assembly.
Text in Illustration
(c) Install the park/neutral position switch assembly to the manual valve lever shaft sub-assembly with the 2 bolts.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
NOTICE:
* Before installing the park/neutral position switch assembly, remove any dirt or rust on the installation portion of the manual valve lever shaft sub-assembly. Be sure to install the switch straight along the shaft while being careful not to deform the plate spring that supports the shaft. If the plate spring is deformed, the park/neutral position switch assembly cannot be reinstalled correctly.
* After installing the park/neutral position switch assembly, confirm that the 2 protrusions on the switch are aligned.
(d) Install the transmission control shaft lever to the manual valve lever shaft sub-assembly with the nut and washer.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
(e) Connect the connector to the park/neutral position switch assembly.
(f) Connect the transmission control cable to the transmission control cable bracket with a new clip.
(g) Connect the transmission control cable to the transmission control shaft lever with the nut.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
(h) Connect the wire harness clamp.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
5. INSTALL INLET AIR CLEANER ASSEMBLY Installation
6. INSTALL COOL AIR INTAKE DUCT SEAL Installation
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION Initial Inspection and Diagnostic Overview
8. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
9. INSPECT SHIFT LEVER POSITION Adjustments
10. ADJUST SHIFT LEVER POSITION Adjustments