Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation





2ZR-FXE STARTING: POWER SWITCH: INSTALLATION

1. INSTALL POWER SWITCH

(a) Attach the 2 claws to install the power switch.

2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY Installation

3. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH Installation

4. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation

5. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY Installation

6. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

7. INSTALL DECK FLOOR BOX RH Installation

8. INSTALL REAR NO. 3 FLOOR BOARD Installation