Installation
HYBRID / BATTERY CONTROL: HV RELAY ASSEMBLY: INSTALLATION
1. INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
CAUTION:
Be sure to wear insulated gloves.
(a) Install the hybrid battery junction block assembly with the 3 nuts.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect the 4 connectors to the hybrid battery junction block assembly.
NOTICE:
The connectors should be connected securely.
2. CONNECT FRAME WIRE Installation
3. CHECK HIGH VOLTAGE CABLE CONNECTION Installation
4. INSTALL UPPER HYBRID BATTERY COVER SUB-ASSEMBLY Installation
5. INSTALL NO. 1 HYBRID BATTERY EXHAUST DUCT Installation
6. INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT Installation
7. INSTALL REAR SEAT ASSEMBLY RH
Installation
8. INSTALL REAR NO. 1 FLOOR BOARD Installation
9. INSTALL TONNEAU COVER ASSEMBLY (w/ Tonneau Cover) Installation
10. INSTALL SERVICE PLUG GRIP
Installation