Installation
2ZR-FXE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL ECM
(a) Install the ECM with the 2 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(b) Install the 2 wire harness clamps.
(c) Connect the 2 ECM connectors.
(1) Connect the 2 ECM connectors and lower the 2 levers.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
* Make sure that the 2 levers are securely locked.
(2) Install the 2 wire harness clamps.
(d) Install the No. 2 engine room wire with the bolt.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(e) Slide the side cover down and engage the 2 claws to install it.
(f) Slide the engine room wire harness down and engage the 2 claws to install it.
(g) Connect the 3 wire harness connectors.
(h) Install the No. 1 relay block cover.
2. INSTALL INVERTER RESERVE TANK ASSEMBLY
(a) Install the inverter reserve tank assembly with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL INVERTER WITH CONVERTER ASSEMBLY
Installation
4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
5. INSTALL DECK FLOOR BOX RH Installation
6. INSTALL REAR DECK FLOOR BOX Installation
7. INSTALL NO. 2 DECK BOARD Installation
8. INSTALL NO. 1 DECK BOARD Installation
9. INSTALL DECK BOARD ASSEMBLY Installation
10. PERFORM REGISTRATION
NOTICE:
The Vehicle Identification Number (VIN) must be input into the replacement ECM Programming and Relearning.
11. PERFORM INITIALIZATION
NOTICE:
* Perform Initialization when replacing the ECM Installation.
* When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.