Operation CHARM: Car repair manuals for everyone.

Removal





2ZR-FXE ENGINE CONTROL: ECM: REMOVAL

1. PRECAUTION

NOTICE:
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notice before proceeding with work Service Precautions.

2. REMOVE DECK BOARD ASSEMBLY Removal

3. REMOVE NO. 1 DECK BOARD Removal

4. REMOVE NO. 2 DECK BOARD Removal

5. REMOVE REAR DECK FLOOR BOX Removal

6. REMOVE DECK FLOOR BOX RH Removal

7. DISCONNECT CABLE FROM NEGATIVE AUXILIARY BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

8. REMOVE INVERTER WITH CONVERTER ASSEMBLY

Removal

9. SEPARATE INVERTER RESERVE TANK ASSEMBLY

(a) Remove the 2 bolts and separate the inverter reserve tank assembly.





10. REMOVE ECM

(a) Remove the No. 1 relay block cover.

(b) Disconnect the 3 wire connectors.





(c) Disengage the 2 claws, push up the engine room wire harness and separate it from the engine room relay block.





(d) Disengage the 2 claws and push up the side cover to remove it.





(e) Loosen the bolt and separate the No. 2 engine room wire.





(f) Disconnect the 2 ECM connectors.

(1) Disconnect the 2 wire harness clamps.





(2) Push the locks on the 2 levers, then raise the levers, and disconnect the 2 ECM connectors.

NOTICE:
After disconnecting the connectors, make sure that dirt, water or other foreign matter does not contact the connecting parts of the connectors.

(g) Separate the 2 wire harness clamps.





(h) Remove the 2 bolts and ECM.