Installation
P410 HYBRID TRANSMISSION / TRANSAXLE: MOTOR CABLE: INSTALLATION
1. INSTALL MOTOR CABLE
NOTICE:
Wear insulated gloves.
(a) Install the motor cable to the hybrid transaxle assembly with the 3 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTICE:
Keep the sealing surface of the motor cable and the connector terminal joint free of foreign matter.
(b) Engage the 2 claws to install a new terminal cap.
NOTICE:
When installing the terminal cap to the motor cable terminal block, keep the sealing surface free of foreign matter.
(c) Place the motor cable connector shell in position and install it with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(d) Connect the 3 clamps.
2. INSTALL INVERTER TRAY BRACKET Installation
3. INSTALL INVERTER RESERVE TANK ASSEMBLY Installation
4. INSTALL INVERTER WITH CONVERTER ASSEMBLY Installation
5. CONNECT WATER HOSE Installation
6. CONNECT NO. 2 ENGINE ROOM WIRE Installation
7. REMOVE INVERTER COVER Installation
8. CONNECT NO. 2 ENGINE WIRE Installation
9. CONNECT MOTOR CABLE Installation
10. CONNECT GENERATOR CABLE Installation
11. CONNECT FRAME WIRE Installation
12. CHECK HIGH VOLTAGE CABLE CONNECTION Installation
13. INSTALL INVERTER COVER Installation
14. INSTALL ENGINE ROOM MAIN WIRE Installation
15. INSTALL NO. 1 INVERTER BRACKET Installation
16. INSTALL SERVICE PLUG GRIP
Installation
17. ADD COOLANT (for Inverter) Coolant (for Inverter)
18. INSPECT FOR COOLANT LEAK (for Inverter) Testing and Inspection
19. INSTALL NO. 1 ENGINE UNDER COVER
20. INSTALL RADIATOR SUPPORT OPENING COVER Installation