Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Air Injection Control Valve: Testing and Inspection





1GR-FE EMISSION CONTROL: AIR SWITCHING VALVE (w/ Secondary Air Injection System): INSPECTION

1. INSPECT AIR SWITCHING VALVE ASSEMBLY





(a) Measure the resistance according to the value(s) in the table below.

Standard resistance:





NOTICE:
When measuring the resistance, do not touch terminals 2, 3, and 4.

If the result is not as specified, replace the air switching valve.

(b) Check operation of the air switching valve.





(1) Check that air does not flow from port A to port B.

Text in Illustration





NOTICE:
Make sure the applied pressure is 30 kPa (0.3 kgf*cm2, 4.4 psi) or less.

If the result is not as specified, replace the air switching valve.

(2) Apply battery voltage across terminals 1 and 5.





Text in Illustration





NOTICE:
When applying voltage, do not touch terminals 2, 3, and 4.

(3) Check that air flows from port A to port B.

If the result is not as specified, replace the air switching valve.