Operation CHARM: Car repair manuals for everyone.

Installation





A750E AUTOMATIC TRANSMISSION: AIR COOLED OIL COOLER: INSTALLATION

1. INSTALL OIL COOLER WITH HOSE ASSEMBLY

(a) Install the oil cooler with hose assembly with the 4 bolts.

Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

(b) Connect the 2 oil cooler hoses with the 2 clips.

2. ADD AUTOMATIC TRANSMISSION FLUID

Procedures

3. INSTALL RADIATOR GRILLE Installation