Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation

INSTALLATION

1. Install injection nozzle holder assembly in the reverse order of removal.
NOZZLE HOLDER SUPPORT
T : 54 - 62 Nm {5.5 - 6.3 kgf-m, 40 - 46 ft-lbf}

2. Connect the spill tube and injection nozzle tube.
INJECTION NOZZLE TUBE FLARE NUT
T : 20 - 25 N m {2.0 - 2.5 kgf-m, 14 - 18 ft-lbf}

3. Bleed air from the fuel system.
4. Connect the ground cable to the battery.