P0510
IDLE SWITCH1. CHECK THE VOLTAGE BETWEEN TERMINALS.
1. Set the starter switch to "LOCK" position and connect signal check harness.
2. Set the starter switch to "ON".
3. Measure the voltage between B24 and C3, C4 terminals of signal check harness.
Standard:
More than 10 V: Release the accelerator pedal.
0 V: Depress the accelerator pedal fully.
2. MEASURE THE VOLTAGE BETWEEN TERMINALS
1. Set the starter switch to "LOCK" .
2. Disconnect the connector of idle switch.
3. Measure the resistance between terminals.
Standard:
Less than 1 ohm: Release the accelerator pedal.
infinite ohms: Depress the accelerator pedal fully.