Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Combination Valve, Checking



Combination valve, checking

Recommended special tools and equipment
- V.A.G 1390 Hand vacuum pump

Test requirements
- No leaks in vacuum lines or hose connections.
- Vacuum lines not clogged or kinked
- Pressure hose for Secondary Air Injection (AIR) Pump Motor not clogged or kinked

Test sequence

Note: Do not use compressed air for the following test!

- Remove front noise insulation.






- Disconnect vacuum hose -1- from Secondary Air Injection (AIR) solenoid valve (N112) -2-.
- Connect hand vacuum pump (V.A.G 1390) to vacuum hose -1- to combination valve
- Disconnect pressure hose at Secondary Air Injection (AIR) pump motor (arrow) and blow into it with light pressure.
Combination valve must close.

Note: To disengage, compress the buttons at the hose coupling.

- Operate vacuum pump.
Combination valve must open.

If the combination valve does not open or it is constantly open:
- Replace combination valve.

- Erase DTC memory of Engine Control Module (ECM).
- Generate readiness code.