New Window, Preparing For Glazing
Flush-Bonded Windows
New Window, Preparing for Glazing
New windows are shipped pre-coated with - PUR -. Pre-coating consists of positions - 1 -, - 2 - and - 3 -.
1. Sealing lip
2. Spacer
3. Application are for adhesive bead
4. Washer
- Rub pre-coating with a dry, lint-free rag.
• Do not prime or use a cleaning solution on the pre-coating.
- Using applicator (D 009 500 15) - 1 - (felt ball with wire), apply activator (D 181 801 A1) thinly onto pre-coating - 2 - only.
- Allow activator to air dry for at least 10 minutes.
• Activator must not come into contact with the paint - otherwise paint will be damaged.