Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Power and Ground Distribution: Service Precautions
Bridging NOTE: When bridging, be careful not to damage anything.
Install the bridge in the positions shown for control signals (usually ground signals), use a short lead with the ends shaved bare.
When bridging at positions 1.1, 1.2 and 1.11 at battery voltage, use a thick lead (e.g.
1.5 mm) and proper lead shoes.