Pinpoint Tests
PINPOINT TESTS A: THE CLOCK OPERATION IS INOPERATIVENormal Operation
The clock receives battery voltage from the smart junction box (SJB) through circuit SBP14 (BN/RD). Ground for the clock is supplied through circuit GD138 (BK/WH).
This pinpoint test is intended to diagnose the following:
- Fuse
- Wiring, terminals or connectors
- Clock
- SJB