Pinpoint Test C: No Power in RUN
Steering Column Switches
Pinpoint Tests
Pinpoint Test C: No Power in RUN
Refer to Wiring Diagram Set 13, Power Distribution/SJB for schematic and connector information. Diagrams By Number
Normal Operation
When the ignition switch is placed in the RUN position, fused ignition voltage is sent to:
- the Smart Junction Box (SJB) along circuit CDC34 (WH/OG).
- pin 85 of the run/start relay in the Battery Junction Box (BJB) along circuit CDC34 (WH/OG).
This pinpoint test is intended to diagnose the following:
- Wiring, terminals or connectors
- Run/start relay
- Ignition switch
- SJB
- BJB
PINPOINT TEST C: NO POWER IN RUN
NOTICE: Use the Flex Probe Kit for all test connections to prevent damage to the wiring terminals. Do not use standard multi-meter probes.
NOTE: Verify that battery voltage is 10 volts or greater.
-------------------------------------------------
C1 CHECK THE IGNITION SWITCH
- Carry out the Ignition Switch - Electrical Component Test.
- Is the ignition switch OK?
Yes
GO to C2.
No
INSTALL a new ignition switch. REFER to Ignition Switch Ignition Switch. TEST the system for normal operation.
-------------------------------------------------
C2 CHECK FOR VOLTAGE AT THE SJB
- Ignition OFF.
- Disconnect: SJB C2280B.
- Ignition ON.
- Measure the voltage between SJB C2280B-45, circuit CDC34 (WH/OG), harness side and ground.
- Is the voltage greater than 10 volts?
Yes
GO to C3.
No
REPAIR circuit CDC34 (WH/OG). TEST the system for normal operation.
-------------------------------------------------
C3 CHECK FOR IGNITION VOLTAGE AT THE RUN/START RELAY
- Ignition OFF.
- Connect: SJB C2280B.
- Disconnect: Run/Start Relay.
- Ignition ON.
- Measure the voltage between run/start relay, circuit CDC34 (WH/OG) and ground.
- Is the voltage greater than 10 volts?
Yes
GO to C4.
No
REPAIR circuit CDC34 (WH/OG). TEST the system for normal operation.
-------------------------------------------------
C4 CHECK THE RUN/START RELAY
- Carry out the Mini ISO Relay Component Test.
- Is the relay OK?
Yes
GO to C5.
No
INSTALL a new relay. TEST the system for normal operation.
-------------------------------------------------
C5 CHECK FOR BATTERY VOLTAGE AT THE RUN/START RELAY
- Measure the voltage between run/start relay circuit SDC02 (RD), and ground.
- Is the voltage greater than 10 volts?
Yes
GO to C6.
No
VERIFY battery voltage is 10 volts or greater. If OK, REPAIR or INSTALL a new BJB. TEST the system for normal operation.
-------------------------------------------------
C6 CHECK FOR CORRECT SJB OPERATION
- Disconnect: SJB C2280b.
- Check the connector for:
- corrosion.
- pushed-out pins.
- spread terminal.
- Connect: SJB C2280b.
- Make sure the connector is seated correctly, then operate the system and verify the concern is still present.
- Is the concern still present?
Yes
INSTALL a new SJB. TEST the system for normal operation.
No
The system is operating correctly at this time. Concern may have been caused by a loose or corroded connector.
-------------------------------------------------