Test E: The Demand Lamps Are Inoperative
PINPOINT TEST E: THE DEMAND LAMPS ARE INOPERATIVEE1-E3:
Normal Operation
The smart junction box (SJB) supplies voltage to the demand lamps on circuit CLN09 (YE/GN). The demand lamps are grounded through circuit GD139 (BK/YE). The glove compartment lamp (MKZ only) is case grounded.
Possible Causes
- Circuit CLN09 (YE/GN) open
- SJB