Operation CHARM: Car repair manuals for everyone.

Reassembly








PROPELLER SHAFT: PROPELLER SHAFT ASSEMBLY (for Regular Cab 2WD): REASSEMBLY

REASSEMBLY

1. INSTALL PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING





(a) Apply MP grease No. 2 to a new spider and bearings.
(b) Fit the spider into the flange yoke.





(c) Measure dimension A between the snap ring grooves.
(d) Insert the spider bearing into the spider journal portion, and then measure dimension B of the universal joint.
NOTICE: When measuring dimension B, fix the spider and spider bearings in a vise and hold them firmly together.





(e) Select snap rings to make dimensions A and B the same.
Snap Ring Type:





NOTE:
- Use new snap rings.
- If possible, use snap rings of the same thickness for both edges.





(f) Insert the spider into the yoke, and then using SST, press the spider bearing into the snap ring groove.
(g) Press in the spider bearing on the opposite side in the same way.
SST: 09332-25010
NOTICE: When pressing in the spider bearing, be careful not to damage its lip.





(h) Using needle-nose pliers, install new snap rings into the grooves of the yoke.
2. INSPECT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING
(a) Check the spider bearings for wear and damage.
(b) Check each spider bearing's axial play by turning the yoke while holding the shaft tightly.
Maximum bearing axial play:
0 to 0.05 mm (0 to 0.002 in.)