Operation CHARM: Car repair manuals for everyone.

Installation





AIR CONDITIONING: COMPRESSOR (for 2GR-FE): INSTALLATION

1. INSTALL COMPRESSOR AND MAGNETIC CLUTCH

(a) Install the compressor and magnetic clutch with the 4 bolts.





Torque : 25 Nm (255 kgf-cm, 18 ft-lbf)

NOTICE:
Tighten the bolts in the order shown in the illustration to install the compressor and magnetic clutch.

2. INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE

(a) Remove the attached vinyl tape from the hose.





(b) Apply sufficient compressor oil to a new O-ring and the fitting surface of the compressor and magnetic clutch.

Compressor oil:

ND-OIL 8 or equivalent

(c) Install the O-ring onto the No. 1 cooler refrigerant suction hose.

(d) Install the No. 1 cooler refrigerant suction hose onto the compressor and magnetic clutch with the bolt.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

3. INSTALL NO. 1 COOLER REFRIGERANT DISCHARGE HOSE

(a) Remove the attached vinyl tape from the hose.





(b) Apply sufficient compressor oil to a new O-ring and the fitting surface of the compressor and magnetic clutch.

Compressor oil:

ND-OIL 8 or equivalent

(c) Install the O-ring onto the No. 1 cooler refrigerant discharge hose sub-assembly.

(d) Install the No. 1 cooler refrigerant discharge hose onto the compressor and magnetic clutch with the bolt.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

4. INSTALL PIPING CLAMP

(a) Install the piping clamp to the No. 1 cooler refrigerant suction hose and No. 1 cooler refrigerant discharge hose.





5. INSTALL GENERATOR ASSEMBLY Installation

6. INSTALL V-RIBBED BELT Installation

7. INSTALL RADIATOR ASSEMBLY Installation

8. INSTALL FAN SHROUD Installation

9. INSTALL RADIATOR SUPPORT UPPER Installation

10. INSTALL NO. 1 OIL COOLER OUTLET TUBE (for Automatic Transaxle) Installation

11. INSTALL NO. 1 OIL COOLER INLET TUBE (for Automatic Transaxle) Installation

12. CONNECT RADIATOR OUTLET HOSE Installation

13. CONNECT RADIATOR INLET HOSE Installation

14. CONNECT RADIATOR RESERVE TANK HOSE Installation

15. INSTALL FRONT BUMPER ENERGY ABSORBER Reassembly

16. INSTALL FRONT BUMPER ASSEMBLY Installation

17. INSTALL NO. 1 AIR CLEANER INLET Installation

18. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

19. INSTALL AIR CLEANER INLET ASSEMBLY Installation

20. CONNECT BATTERY NEGATIVE TERMINAL

21. ADD ENGINE COOLANT Testing and Inspection

22. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection

23. CHARGE WITH REFRIGERANT Service and Repair

24. WARM UP ENGINE Service and Repair

25. CHECK FOR REFRIGERANT LEAKS Service and Repair

26. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

27. INSTALL COOL AIR INTAKE DUCT SEAL Installation

28. INSTALL ENGINE UNDER COVER RH

29. INSTALL ENGINE UNDER COVER LH

30. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH

31. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH

32. INSTALL FRONT FENDER APRON SEAL RH

33. INSTALL FRONT WHEEL RH

34. VEHICLE PREPARATION FOR FOG LIGHT AIMING (w/ Fog Light) Adjustments

35. PREPARATION FOR FOG LIGHT AIMING (w/ Fog Light) Adjustments

36. FOG LIGHT AIMING INSPECTION (w/ Fog Light) Adjustments

37. FOG LIGHT AIMING ADJUSTMENT (w/ Fog Light) Adjustments