Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Manual Trans | ||||
| One | 18.3 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And plastigage bearings. |
| One, Both Banks | 20.7 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And plastigage bearings. |
| All, Both Banks | 27.0 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And plastigage bearings. |
| Auto Trans | ||||
| One | 19.2 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And plastigage bearings. |
| One, Both Banks | 21.6 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And plastigage bearings. |
| All, Both Banks | 27.9 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And plastigage bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs. | ||||
| Crankshaft, Renew | 0.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Timing Gears, Renew | 1.7 | 0.0 | A |