AB8 - Check PIP Signal
- Key "OFF".
- Breakout box installed, Powertrain Control Module (PCM) connected. Switch timing switch to "DIST" position on breakout box.
- Measure voltage between test pin 56 and test pin 16 at breakout box.
- Crank engine, record reading.
- Is voltage between 3.0 and 7.0 volts?
Yes -- Go to AB9. AB9 - Check Continuity of Ignition Ground Circuit
No -- Go to AB11. AB11 - Check Continuity of PIP Circuit