Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Preliminary Testing Notes

^ When making measurements on a wiring harness, both a visual inspection and a continuity test should be performed.

^ Inspect the connector pins for damage (corrosion, bent or spread pins, etc.) when directed to remove a connector.

^ Spark timing adjustments are not possible.

^ When making voltage checks a GROUND reading means any value within a range of 0 to 1 volt. Also B+ readings mean any value that falls within a range of B+ to 2 volts less than B+.

^ When making voltage checks and a reference to ground is made use either the negative battery lead or cast iron on the engine. B+ means the positive battery cable at the battery.

^ When using the spark plug firing indicator, place the grooved end as close as possible to the plug boot. Very weak flashing may be caused by a fouled plug.

^ Do not use an incandescent test lamp to check the PIP, SPOUT IDM or CID circuits. The lamp will prevent the circuit from operating.