Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Connecting Rod: Service and Repair

Fig. 16 Piston & Rod Assembly:





1. Assemble the piston with its front mark aligned with the connecting rod's front mark. These markings must also face the front of the engine on installation.
2. Torque new torque-to-yield connecting rod cap bolts in several alternating passes to 30-33 ft lb, then rotate an additional 90-120°. After installation, ensure big end side clearance is 0.006-0.012 in. Maximum service limit is 0.0137 in.