Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Cylinder Head Assembly

INTAKE MANIFOLD





Upper intake manifold bolts 10Nm (89 in.lbs.)





Lower Intake manifold bolts
Stage 1: Tighten bolts to 15 Nm (11 ft. lbs.).
Stage 2: Tighten bolts to 32 Nm (24 ft. lbs.).

CYLINDER HEAD

Head gasket surface flatness 0.08 mm (0.003 inch) 152.0 mm (6.00 inch)






Stage 1: Tighten to 50 Nm (37 ft. lbs.).
Stage 2: Loosen the bolts one full turn.
Stage 3: Tighten to 30 Nm (22 ft. lbs.).
Stage 4: Rotate each bolt 90 degrees.
Stage 5: Rotate each bolt an additional 90 degrees.

EXHAUST MANIFOLD

Right Hand:





Left Hand:






Stage 1: Tighten bolts 10 Nm (89 inch lbs.).
Stage 2: Tighten bolts 22 Nm (16 ft. lbs.).

CAMSHAFT SPROCKET
Camshaft sprocket-to-camshaft bolt 63 Nm (46 Ft.lbs.)