Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Pinpoint Tests
PINPOINT TESTS A: THE CLOCK OPERATION IS INOPERATIVEA1:
A1-A3:
A4:
Normal Operation The clock receives battery voltage from the smart junction box (SJB) through circuit SBP14 (BN/RD). Ground for the clock is supplied through circuit GD138 (BK/WH).
Possible Causes -
Fuse
-
Circuit SBP14 (BN/RD) open
-
Circuit GD138 (BK/WH) open
-
Clock
-
SJB