Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Timing Cover





Using new gaskets, position the engine front cover onto the dowels and install the 16 bolts.
Tighten the bolts in the sequence shown:
Stage 1: Bolts 1 through 14 to 25 Nm (18 lb-ft).
Stage 2: Bolts 15 and 16 to 50 Nm (37 lb-ft).











Install the oil pan-to-engine front cover bolt and the 3 oil pan-to-engine front cover stud bolts.
Tighten to 25 Nm (18 lb-ft).