Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Camshaft, Renew | 0.2 | 0.0 | A | |
| Crankshaft, Renew | 0.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| One CYL | ||||
| Right Bank | 10.9 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Left Bank | 10.6 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Both Banks | 14.1 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Note | ||||
| With AC, Add | 0.5 | 0.0 | A | |
| With Auto Trans, Add | 0.5 | 0.0 | A | |
| With Cruise Control, Add | 0.2 | 0.0 | A | |
| With Manual Trans, Add | 0.5 | 0.0 | A | |
| Each Additional | 0.8 | 0.0 | A | |
| Note | ||||
| With AC, Add | 0.5 | 0.0 | A | |
| With Cruise Control, Add | 0.2 | 0.0 | A | |
| With Auto Trans, Add | 0.5 | 0.0 | A | |
| With Manual Trans, Add | 0.5 | 0.0 | A |