Installation
2GR-FSE LUBRICATION: OIL PUMP: INSTALLATION
1. INSTALL TIMING CHAIN CASE OIL SEAL
(a) Using SST, tap in a new oil seal until its surface is flush with the timing gear case edge.
SST : 09223-22010
SST : 09506-35010
NOTICE:
* Keep the lip free of foreign matter.
* Do not tap on the oil seal at an angle.
* Make sure that the oil seal edge does not stick out of the timing chain case.
2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
(a) Apply seal packing in a continuous line to the engine unit as shown in the following illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Seal diameter:
A
3.0 to 4.0 mm (0.118 to 0.158 in.)
B
3.0 mm (0.118 in.)
NOTICE:
* Be sure to clean and degrease the contact surfaces, especially the surfaces indicated by C in the illustration.
* When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
* Install the chain cover within 3 minutes.
* Do not start the engine for at least 2 hours after installing.
(b) Apply seal packing in a continuous line to the timing chain cover as shown in the following illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent
NOTICE:
* When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
* Install the chain cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
* Do not start the engine for at least 2 hours after installing.
Seal Packing Application Chart:
(c) Install a new gasket.
(d) Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.
(e) Temporarily tighten the timing chain cover with the 25 bolts and 2 nuts.
Bolt length:
NOTICE:
Make sure that there is no oil on the bolt threads.
(f) Fully tighten the 3 bolts as shown in the illustration.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf for bolt A)
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf for bolts except A)
(g) Fully tighten the 3 bolts as shown in the illustration.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(h) Fully tighten the 7 bolts and 2 nuts as shown in the illustration.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
HINT
Tighten the bolts and nuts in order from upper to lower as shown in the illustration.
(i) Fully tighten the 12 bolts as shown in the illustration.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
HINT
Tighten the bolts in order from lower to upper as shown in the illustration.
(j) Install the wiring harness bracket with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH Reassembly
4. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH (for Bank 2) Reassembly
5. INSTALL NO. 2 OIL PIPE Reassembly
6. INSTALL NO. 1 OIL PIPE Reassembly
7. INSTALL IGNITION COIL ASSEMBLY Installation
8. INSTALL NO. 2 FUEL PIPE Installation
9. INSTALL FUEL PUMP ASSEMBLY Installation
10. CONNECT NO. 2 FUEL PIPE Installation
11. INSTALL NO. 1 FUEL PIPE Installation
12. INSTALL FUEL PRESSURE PULSATION DAMPER Installation
13. INSTALL OIL STRAINER SUB-ASSEMBLY Reassembly
14. INSTALL OIL PAN SUB-ASSEMBLY Reassembly
15. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY Reassembly
16. INSTALL WATER INLET Installation
17. INSTALL CRANKSHAFT PULLEY Installation
18. INSTALL WATER HOSE JOINT Installation
19. INSTALL NO. 2 SURGE TANK STAY Installation
20. INSTALL INTAKE AIR SURGE TANK ASSEMBLY
Installation
21. INSTALL INJECTOR DRIVER Installation
22. INSTALL ENGINE WIRE Installation
23. INSTALL WATER PUMP PULLEY Installation
24. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY Installation
25. INSTALL ENGINE MOUNTING BRACKET LH Installation
26. INSTALL ENGINE MOUNTING BRACKET RH Installation
27. CONNECT COMPRESSOR AND MAGNETIC CLUTCH Installation
28. INSTALL GENERATOR ASSEMBLY Installation
29. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
30. INSTALL NO. 1 ENGINE COVER Installation
31. INSTALL NO. 2 ENGINE COVER Installation
32. INSTALL V-RIBBED BELT Installation
33. INSTALL ENGINE HANGERS Installation
34. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY Installation
35. INSTALL FRONT SUSPENSION CROSSMEMBER SUB-ASSEMBLY Installation
36. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
Installation
37. INSTALL STARTER ASSEMBLY Installation
38. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation
39. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH Installation
40. INSTALL OIL DIPSTICK GUIDE SUB-ASSEMBLY Installation
41. INSTALL ENGINE AND TRANSMISSION ASSEMBLY Installation
42. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY Installation
43. CONNECT POWER STEERING LINK WIRE HARNESS Installation
44. INSTALL FRONT LOWER BALL JOINT ASSEMBLY LH Installation
45. INSTALL FRONT LOWER BALL JOINT ASSEMBLY RH Installation
46. INSTALL FRONT SHOCK ABSORBER ASSEMBLY LH Installation
47. INSTALL FRONT SHOCK ABSORBER ASSEMBLY RH Installation
48. CONNECT HEIGHT CONTROL SENSOR LINK Installation
49. INSTALL STEERING SLIDING WITH SHAFT YOKE SUB-ASSEMBLY Installation
50. INSTALL FRONT LOWER SUSPENSION MEMBER PROTECTOR Installation
51. CONNECT FUEL TUBE SUB-ASSEMBLY Installation
52. CONNECT NO. 3 FUEL HOSE Installation
53. CONNECT FUEL MAIN TUBE
Service Precautions
54. CONNECT ENGINE WIRE Installation
55. INSTALL ECM COVER Installation
56. CONNECT DISCHARGE HOSE SUB-ASSEMBLY Installation
57. CONNECT NO. 1 COOLER REFRIGERANT SUCTION HOSE Installation
58. CONNECT INLET HEATER WATER HOSE Installation
59. CONNECT OUTLET HEATER WATER HOSE Installation
60. CONNECT INLET RADIATOR HOSE Installation
61. CONNECT OUTLET RADIATOR HOSE Installation
62. CONNECT RADIATOR RESERVOIR TANK HOSE Installation
63. CONNECT NO. 2 FUEL VAPOR FEED HOSE Installation
64. CONNECT UNION TO CHECK VALVE HOSE Installation
65. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
66. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation
67. INSTALL NO. 1 INLET AIR CLEANER Installation
68. INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
Installation
69. INSTALL FRONT EXHAUST PIPE ASSEMBLY
Installation
70. ADD ENGINE OIL Replacement
71. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
72. ADD ENGINE COOLANT Testing and Inspection
73. CHARGE REFRIGERANT Service and Repair
74. CHECK FOR FUEL LEAKS Testing and Inspection
75. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection
76. CHECK FOR ENGINE OIL LEAKS
77. CHECK FOR EXHAUST GAS LEAKS
78. CHECK FOR LEAKAGE OF REFRIGERANT Service and Repair
79. INSTALL FRONT WHEEL
Torque : 103 Nm (1,050 kgf-cm, 76 ft-lbf)
80. PLACE FRONT WHEELS FACING STRAIGHT AHEAD
81. ADJUST SHIFT LEVER POSITION Adjustments
82. CHECK SHIFT LEVER POSITION A760E Automatic Transmission
83. CHECK AND ADJUST FRONT WHEEL ALIGNMENT
Front Wheel Alignment
84. CHECK IGNITION TIMING Engine
85. CHECK IDLE SPEED Engine
86. CHECK CO/HC Engine
87. CHECK ENGINE OIL LEVEL Testing and Inspection
88. INSTALL ENGINE UNDER COVER REAR LH Installation
89. INSTALL ENGINE UNDER COVER REAR RH Installation
90. INSTALL NO. 2 ENGINE UNDER COVER
91. INSTALL ENGINE UNDER COVER
92. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
93. INSTALL ENGINE ROOM SIDE COVER LH Installation
94. INSTALL ENGINE ROOM SIDE COVER RH Installation
95. INSTALL COOL AIR INTAKE DUCT SEAL Installation