Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Function Test - Section 11
Preparation for Test: 1.
Ignition:
ON,
2.
Side windows open,
3.
Fuses ok for PSE control module, electronic ignition switch
(EIS),
4.
Battery voltage
11 to 14 V,
5.
Review Connection and Use of Test Equipment, Component Locations, Connection of Components, Preparation for Test and Pneumatic Test Program.
Test Steps 1.0, 2.0, 3.0, 4.0 & 5.0:
Test Steps 6.0, 7.0, 8.0 & 9.0:
Test Steps 10.0, 11.0 & 12.0: