Air Outlet Replacement - Center
REMOVAL PROCEDURE1. Remove the IP assembly.
2. Remove the center air distribution duct nuts.
3. Remove the center air distribution duct from the IP carrier.
INSTALLATION PROCEDURE
1. Position the center air distribution duct to the IP carrier.
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the center air distribution duct nuts.
Tighten
Tighten the nuts to 10 N.m (89 lb in).
3. Install the IP assembly.