Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Control Module HVAC: Service and Repair

BLOWER MOTOR CONTROL PROCESSOR REPLACEMENT

REMOVAL PROCEDURE




1. Remove the right side instrument panel insulator.
2. Disconnect the blower motor electrical connector.
3. Remove the blower motor mounting screws.
4. Remove the blower motor from the HVAC module assembly.




5. Disconnect the electrical connector from the blower motor control processor assembly.

IMPORTANT: Only loosen both of the forward blower control processor mounting screws. The forward blower control processor mounting holes are slotted.




6. Loosen the forward blower control processor mounting screws.
7. Remove the rearward blower control processor mounting screw.
8. Remove the blower control processor assembly from the HVAC module assembly.

INSTALLATION PROCEDURE




1. Install the blower motor control processor assembly to the HVAC module assembly.

NOTE: Refer to Fastener Notice in Service Precautions.

2. Install the rearward blower control processor mounting screw.

Tighten
Tighten all of the screws to 1.8 N.m (16 lb in).




3. Connect the electrical connector to the blower control processor assembly.
4. Install the blower motor to the HVAC module assembly.
5. Install the blower motor mounting screws.

Tighten
Tighten the screws to 1.8 N.m (16 lb ft).




6. Connect the blower motor electrical connector.
7. Install the right side instrument panel insulator.