Installation
HYBRID / BATTERY CONTROL: HV RELAY ASSEMBLY: INSTALLATION
1. INSTALL HYBRID BATTERY JUNCTION BLOCK
CAUTION:
Be sure to wear insulated gloves.
(a) Install the hybrid battery junction block with the 3 nuts.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect the 2 connectors to the hybrid battery junction block.
NOTICE:
The connectors should be connected securely.
(c) Connect the 2 connectors to the hybrid battery junction block.
2. CONNECT FRAME WIRE Installation
3. CHECK HIGH VOLTAGE CABLE CONNECTION Installation
4. INSTALL UPPER HYBRID BATTERY COVER SUB-ASSEMBLY
HINT
Installation.