VARIABLE VALVE TIMING ACTUATOR INSPECTION [MZR 2.0 DISI i-stop]
id011037801200
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [MZR 2.0 DISI i-stop].)
2. Disconnect the negative battery cable.
3. Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION [MZR 2.0 DISI i-stop].)
4. Disconnect the wiring harness.
5. Remove the high pressure fuel pump. (See HIGH PRESSURE FUEL PUMP REMOVAL/INSTALLATION [MZR 2.0 DISI i-stop].)
6. Remove the ignition coils. (See IGNITION COIL REMOVAL/INSTALLATION [MZR 2.0 DISI i-stop].)
7. Remove the ventilation hose.
8. Remove the dipstick.
9. Remove the cylinder head cover. (See TIMING CHAIN REMOVAL/INSTALLATION [MZR 2.0 DISI i-stop].)
10. Confirm that notch of the rotor and notch of the cover at the variable valve timing actuator are aligned and fitted.
am6xuw00002472
|
11. Install in the reverse order of removal.