VALVE CLEARANCE INSPECTION [MZR 2.0, MZR 2.5]
id011006803400
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [MZR 2.0, MZR 2.5].)
2. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR 2.0, MZR 2.5].)
3. Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION [MZR 2.0, MZR 2.5].)
4. Disconnect the wiring harness.
5. Remove the ignition coils. (See IGNITION COIL REMOVAL/INSTALLATION [MZR 2.0, MZR 2.5].)
6. Remove the ventilation hose.
7. Remove the dipstick.
8. Remove the cylinder head cover. (See TIMING CHAIN REMOVAL/INSTALLATION [MZR 2.0, MZR 2.5].)
9. Remove the aerodynamic under cover No.2 and splash shield as a single unit. (See AERODYNAMIC UNDER COVER NO.2 REMOVAL/INSTALLATION.) (See SPLASH SHIELD REMOVAL/INSTALLATION.)
10. Measure the valve clearance.
am3uuw00002166
|
11. Install in the reverse order of removal.