VALVE CLEARANCE INSPECTION [MZR 1.8, MZR 2.0, MZR 2.5]
id011005803400
1. Disconnect the negative battery cable.
2. Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5].)
3. Disconnect the wiring harness.
4. Remove the ignition coils. (See IGNITION COIL REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5].)
5. Remove the spark plugs. (See SPARK PLUG REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5].)
6. Disconnect the ventilation hose from the cylinder head cover.
7. Remove the dipstick.
8. Remove the cylinder head cover. (See TIMING CHAIN REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5].)
9. Set the front mudguard (RH) out of the way. (See FRONT MUDGUARD REMOVAL/INSTALLATION.)
10. Remove the splash shield (RH). (See SPLASH SHIELD REMOVAL/INSTALLATION.)
11. Measure the valve clearance.
am6zzw00005153
|
am6zzw00005153
|
12. Install in the reverse order of removal.