SOLENOID VALVE REMOVAL/INSTALLATION (SECONDARY CONTROL VALVE BODY) [FS5A-EL]
id051721808000
1. Clean the transaxle exterior throughout with a steam cleaner or cleaning solvents.
2. Disconnect the negative battery cable.
3. Remove the battery and battery tray. (See BATTERY REMOVAL/INSTALLATION [L8, LF, L5].)
4. Remove the aerodynamic under cover NO.2. (See AERODYNAMIC UNDER COVER NO.2 REMOVAL/INSTALLATION.)
5. Drain the ATF into a separate suitable container. (See AUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT [FS5A-EL].)
6. Remove the EPS control module. (See EPS CONTROL MODULE REMOVAL/INSTALLATION.)
7. Remove the oil cover. (See SECONDARY CONTROL VALVE BODY REMOVAL [FS5A-EL].)
8. Remove the secondary control valve body. (See SECONDARY CONTROL VALVE BODY REMOVAL [FS5A-EL].)
9. Remove the bracket.
am6zzw00000321
|
10. Remove the solenoid valve(s).
am6zzw00002895
|
11. Apply ATF to a new O‐ring and install it on the solenoid valve.
12. Install the solenoid valve in the secondary control valve body.
13. Install the secondary control valve body. (SeeSECONDARY CONTROL VALVE BODY REMOVAL [FS5A-EL].)
14. Install the oil cover. (SeeSECONDARY CONTROL VALVE BODY REMOVAL [FS5A-EL].)
15. Install the EPS control module. (SeeEPS CONTROL MODULE REMOVAL/INSTALLATION.)
16. Install the battery and battery tray. (SeeBATTERY REMOVAL/INSTALLATION [L8, LF, L5].)
17. Add ATF. (SeeAUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT [FS5A-EL].)
18. Install the aerodynamic under cover NO.2. (See AERODYNAMIC UNDER COVER NO.2 REMOVAL/INSTALLATION.)
19. Connect the negative battery cable.
20. Perform the mechanical system test. (SeeMECHANICAL SYSTEM TEST [FS5A-EL].)