VARIABLE DYNAMIC EFFECT INTAKE-AIR (VDI) VALVE REMOVAL/INSTALLATION [13B-MSP]
id0113z3526600
1. Complete the "BEFORE SERVICE PRECAUTION". (See BEFORE SERVICE PRECAUTION [13B-MSP].)
2. Remove the engine cover. (See. ENGINE COVER REMOVAL/INSTALLATION [13B-MSP])
3. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [13B-MSP].)
4. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [13B-MSP].)
5. Drain the engine coolant. (See ENGINE COOLANT REPLACEMENT [13B-MSP].)
6. Remove the air hose and throttle body. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [13B-MSP].)
7. Remove the dipstick pipe installation bolt. (See ENGINE DISASSEMBLY/ASSEMBLY [13B-MSP].)
8. Remove the extension manifold and oil filler pipe. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [13B-MSP].)
9. Remove the metering oil pump No.1 (See METERING OIL PUMP REMOVAL/INSTALLATION [13B-MSP].)
10. Remove the clip securing wiring harness from the metering oil pump bracket and set the wiring harness aside.
11. Remove in the order shown in the figure.
12. Install in the reverse order of removal.
13. Complete the "AFTER SERVICE PRECAUTION". (See AFTER SERVICE PRECAUTION [13B-MSP].)
ar8wzw00001445
|
1
|
VDI valve
|