DASH-ELECTRICAL SUPPLY UNIT REMOVAL/INSTALLATION [FULL-AUTO AIR CONDITIONER]


id0740a1704400

Caution
•  When replacing the dash-electrical supply unit, perform the configuration to assure that the system operates correctly.

1.  To replace the dash-electrical supply unit, perform the following procedure.

(1)  Connect the M-MDS to the DLC-2.
(2)  Switch the main power ON (READY off).
(3)  Activate the M-MDS and perform the following procedure.
1)  Press [Start] to start the vehicle identification.
2)  Press the [Toolbox] tab.
3)  Press the [Work Support] icon.
4)  Press [Configuration].
5)  Press [Run] to perform the configuration.
6)  Press [DASH_ESU].
7)  When [Install the new ECU] is displayed, move to the dash-electrical supply unit replacement procedure.

2.  Remove the selector lever knob. (See SELECTOR LEVER REMOVAL/INSTALLATION [A71M].)

3.  Disconnect the negative lead-acid battery terminal. (See NEGATIVE LEAD-ACID BATTERY TERMINAL DISCONNECTION/CONNECTION.)

4.  Remove the following parts:

(1)  Shift panel (See SHIFT PANEL REMOVAL/INSTALLATION.)
(2)  Console panel (See CONSOLE PANEL REMOVAL/INSTALLATION.)
(3)  Passenger-side decoration panel (See DECORATION PANEL REMOVAL/INSTALLATION.)
(4)  Passenger-side scuff plate (See SCUFF PLATE REMOVAL/INSTALLATION.)
(5)  Passenger-side front side trim (See FRONT SIDE TRIM REMOVAL/INSTALLATION.)
(6)  Glove compartment(See GLOVE COMPARTMENT REMOVAL/INSTALLATION [(E)].)
(7)  Dashboard under cover (See DASHBOARD UNDER COVER REMOVAL/INSTALLATION.)
(8)  Passenger-side lower panel(See PASSENGER-SIDE LOWER PANEL REMOVAL [(E)].) (See PASSENGER-SIDE LOWER PANEL INSTALLATION [(E)].)

5.  Disconnect the connectors.

a30zzw00002862

6.  Remove the screws.

7.  Remove the dash-electrical supply unit.

8.  Install in the reverse order of removal.

9.  If the dash-electrical supply unit is replaced, perform the following procedure.

(1)  Return to the M-MDS operation and press [Continue].
(2)  When the M-MDS processing is completed, press [Next].
(3)  When the M-MDS processing is completed, press [Next].
(4)  Verify that the following conditions/operations are met/completed, mark the check boxes, and then press [Next].
•  Switch the main power ON (READY off)
•  Install battery charger to vehicle
•  Lead-acid battery voltage: 11.6 V or more
•  Connect power cable to M-MDS
•  Front doors on both sides and liftgate are open
(5)  Press [Finish].
(6)  Switch the main power OFF.
(7)  Switch the main power ON (READY off) to complete the global central configuration (GCC) for the dash-electrical supply unit.
(8)  Clear the DTC. (See CLEARING DTC.)